Tram network extension

Tram network extension

In order to further promote public transport in our city and make it attractive for even more people, we are constantly working on expanding our tram network. In addition to the new lines that we are planning as part of the Chemnitz model together with Verkehrsverbund Mittelsachsen and the city of Chemnitz, we have analysed other potential tram routes.

Tram network extension Zeisigwald

The planned route begins on Straße der Nationen, where the existing infrastructure currently ends in the main station loop. It then runs to Wilhelm-Külz-Platz, turns onto August-Bebel-Straße and finally runs via Thomas-Mann-Platz to Zeisigwaldstraße.

Almost the entire route is planned as a railway track flush with the road. At the same time, modern facilities for pedestrians and cyclists will be created and accessibility for all public transport and pedestrians along the route will be ensured.

Chronological classification

Status: 1 November 2024

2020Feasibility studies including benefit-cost analyses of the route network extension together with the engineering office Verkehrsconsult Dresden Berlin (VCDB) and the City of Chemnitz with positive results
16 March 2022Confirmation of the further development of local public transport in Chemnitz and thus of the route network extension project by the city council
2nd quarter 2022Submission of an application for funding with the aim of acquiring federal and state funds
2023Europe-wide invitation to tender for the general planning services
4th quarter 2023Preparatory surveying work along the entire planned route
December 2023Start of planning services
Early 2025Completion of the variant analysis

Tram network extension Reichenbrandt

The planned route runs along the existing line to Schönau and turns onto Zwickauer Straße at Guerickestraße. There it runs to the Reichenbrand church.

The construction of the tram line will simultaneously create modern pedestrian and cycle traffic facilities and significantly upgrade the entire Zwickauer Straße between the ‘Guerickestraße/Jaenickestraße’ junction and ‘Reichenbrand Church’ in terms of urban development.

Chronological classification

Status: 1 November 2024

2020Feasibility studies including benefit-cost analyses of the route network extension together with the engineering office Verkehrsconsult Dresden Berlin (VCDB) and the City of Chemnitz with positive results
16 March 2022Confirmation of the further development of local public transport in Chemnitz and thus of the route network extension project by the city council
2nd quarter 2022Feasibility study of the alternative terminus points DRK Hospital and FORTIS Academy
2nd quarter of 2022Submission of a funding application with the aim of acquiring federal and state funding
Early 2025Invitation to tender for planning services up to service phase three according to HOAI (design planning) in order to intensify planning